Project Network Members

NedIndo

To add a new contact for your organization or to update any of the information on this page, send an email to secretariat@globalmethane.org with the name of your organization in the subject line. Please identify in the email any information that should be updated.

Partner Profile

Type of Organization: Other
Description of Services:

NedIndo is looking for a certificate of standard operating procedure from and authorized renewable energy certification organisation. Bioreactor --> Biogas --> synchronous generator --> electricity our bioreactor process: we made 3(three) holes 6 m in diameter and 8 m deep, we then filled the hole with sludge, then filled it with grass, then with all cattle manure. We closed the top with a stainless steel panel that is 6 m in diameter, and let the suns heating (temperature in here is 32 degree Celcius ) for 2-3 weeks until the Biogas comes out and flow to gasometer in synchronous generator. Thank you very much for any advice.

Sector(s) of Interest:  
Area(s) of Geographic Interest: Indonesia
Web Site: http://www.graffitorrent.net/nedindo/
Contacts: Mulia, Alfi
Email: mulia@telkom.net.id
Phone: +(62) 31 7348770