Description of Services: |
NedIndo is looking for a certificate of standard operating procedure from and authorized
renewable energy certification organisation.
Bioreactor --> Biogas --> synchronous generator --> electricity
our bioreactor process:
we made 3(three) holes 6 m in diameter and 8 m deep, we then filled the hole with sludge, then filled it with grass, then with all cattle manure. We closed the top with a stainless steel panel that is 6 m in diameter, and let the suns heating
(temperature in here is 32 degree Celcius ) for 2-3 weeks
until the Biogas comes out and flow to gasometer in synchronous
generator.
Thank you very much for any advice. |